Lotus Rose’s 2019 re-fit

David Phillips sent us these photo’s of Lotus Rose’s recent re-fit. Very relieved no re-planking was needed, but above the waterline some new beams were needed and as the photo’s show the cabin top and wheelhouse were re-placed. All done by David’s boatbuilder friend who flew over from his home in Thailand to do the work!